Delivery challenges of design-build for private building contraction projects

dc.contributor.authorMwakapande, Hosea Nazaret
dc.date.accessioned2020-12-14T10:20:09Z
dc.date.available2020-12-14T10:20:09Z
dc.date.issued2008
dc.descriptionAvailable in print form, East Africana Collection, Dr.Wirbert Chagula Library, Class mark (THS EAF HD9715.5T34M82)en_US
dc.description.abstractThe Construction Industry plays a vital role m the economic and physical development of any country. In Tanzania, however, the performance of D-B projects is inadequate. This study identified the challenges faced by building contractors when executing D-B projects in Tanzania. The study was based on the information gathered from questionnaires supported by interviews. A sample of 26 contractors based in Dar es Salaam was selected through random sampling. 26 questionnaires were distributed to contractors and with rigorous follow-up a response rate of 100% was achieved. SPSS software was among the tools used to synthesize the data. It was established that, majority of the building contractors executed D-B projects despite of encountering several challenges during the scope. 81% response indicated that D-B projects were delivered on time and on budget at owner's satisfaction. 75% response indicated that D-B approach was better than D-B-B method on delivering construction projects. The response on major success factors for delivering D-B projects showed that:- 97% response needed D-B projects delivery processes to be mainstreamed in the regulatory framework; 95% response needed clear framework for delivering D-B private projects to be in place; and 85% response indicated that, construction firms lack appropriate professionals for delivering D-B projects in Tanzania. Evidently, challenges/drawback issues associated with the process of delivering D-B projects in Tanzania need promptly attention. A framework for delivering D-B projects in Tanzania need promptly attention a framework for delivering D-B projects has been proposed as a way forward to address the existing challenges and improving D-B project performance in Tanzania and worldwide.en_US
dc.identifier.citationMwakapande, H. N (2008) Delivery challenges of design-build for private building contraction projects, Masters dissertation, University of Dar es Salaam, Dar es Salaam.en_US
dc.identifier.urihttp://41.86.178.5:8080/xmlui/handle/123456789/13814
dc.language.isoenen_US
dc.publisherUniversity of Dar es Salaamen_US
dc.subjectConstructionen_US
dc.subjectConstruction industryen_US
dc.subjectDar es Salaamen_US
dc.titleDelivery challenges of design-build for private building contraction projectsen_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Hosea Nazaret Mwakapande.pdf
Size:
179.1 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: