Developing models for predicting time and cost overruns in road construction projects: a case study of the Tanzania National Road Agency (TANROADS)

dc.contributor.authorBasondole, Paul Francis
dc.date.accessioned2020-01-17T08:14:07Z
dc.date.available2020-01-17T08:14:07Z
dc.date.issued2008
dc.descriptionAvailable in print form, East Africana Collection, Dr. Wilbert Chagula Library, Class mark (THS EAF TE209.5T34B37)en_US
dc.description.abstractMany road construction projects in Tanzania suffer from time and cost overruns, and there are no models to forecast their magnitudes. This dissertation on Developing Models for Predicting Time and Cost Overruns in Road Construction Projects: A Case Study of the Tanzania National Roads Agency (TANROADS), identified, ranked and prioritized factors influencing them at construction phase and explored whether there is an association between them. Sixty six respondents, about 67% of the total questionnaires sent out, ranked pre-identified factors. Using data from 35 projects executed by TANROADS between 2002 and 2006, the forecasting models were developed. The study established that inadequate contractors capacity (icc); availability of road construction equipment (ae), funding delays (fd); inadequate funding (if); unrealistic client's time and cost budgets (ucb); fluctuations of materials, labour and plant costs (fc); and poor supervision (ps) respectively were the top ranked. Having rated the factors on a 5-point scale, the predicted project completion duration, D (in days) and predicted contract value, V (in shillings) are respectively given by D=-74.5+1.3d+19icc-23.2ae+27.7fd+9.6f+5.1ucb and V=-934.9+1.7v+640icc-526.8ucb+344.6ae-73.8fd-3 16.7fc+121ps. The adjusted coefficients of multiple determinations (R2) show that 96% and 93% of the variations in the time and cost overruns respectively could be explained by the top ranked factors. However, the findings were derived from projects carried out by TANROADS alone; they should not therefore be generalized to projects which fall in different environment. A research encompassing projects in other civil engineering and building categories, which were not included in this study, is recommended.en_US
dc.identifier.citationBasondole, P. F (2008) Developing models for predicting time and cost overruns in road construction projects: a case study of the Tanzania National Road Agency (TANROADS), Master dissertation, University of Dar es Salaam. Dar es Salaam.en_US
dc.identifier.urihttp://41.86.178.5:8080/xmlui/handle/123456789/6603
dc.language.isoenen_US
dc.publisherUniversity of Dar es Salaamen_US
dc.subjectProject cost forecastingen_US
dc.subjectRoad constructionsen_US
dc.subjectTime and cost overrunsen_US
dc.subjectNational Roads Agency (TANROAD)en_US
dc.titleDeveloping models for predicting time and cost overruns in road construction projects: a case study of the Tanzania National Road Agency (TANROADS)en_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Paul Francis Basondole .pdf
Size:
6.64 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: