Repository logo
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
Repository logo
    Communities & Collections
    All of DSpace
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Matemba, Esther"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • No Thumbnail Available
    Item
    Cost performance prediction model for construction projects in Tanzania a case study of water projects
    (University of Dar es Salaam, 2009) Matemba, Esther
    Construction projects are very important in social economic development of any country. However construction projects in Tanzania have a poor track record of meeting costs; most of them are characterized by significant cost overruns. The problem could be the lack of a systematic construction project cost performance management system. This dissertation, Cost Performance Prediction Model for Construction Projects in Tanzania: A case study of water projects tries to solve the problem by developing a model that will help predict the cost performance of Construction projects using factors that affect cost performance of construction projects. The top ten factors out of the 18 priority factors, identified from seven researches done previously, were selected as critical factors to be used in the model. The model required data on costs of critical factors as independent variables and cost overrun as a dependent variable which was collected from 31 project documents of Water projects undertaken between 2002 and 2009. The cost overruns and their respective costs from factors of cost performance were analysed by a regression model using SPSS program and the Cost performance, model for construction projects was developed as: Co = 1.551 + 0.989 Pc +0.952Vc +0.906Us + 0.975Ae + 2.013Pd + 4.61948 In conclusion, the dissertation was able to develop a model that predicts cost performance of construction projects given certain factors inherent in the project delivery process or environment. It then recommends that the model developed be used in construction projects to plan and control costs.

About Library

The University of Dar es Salaam Library is a vital source of scholarly information that facilitates users to get access to learning and research resources during their studies. It provides access to a wide range of resources in both print and digital formats and conducive reading environment for users, regardless of their physical conditions. All registered users are eligible to access library resources and can borrow print materials from general shelves for a specific period of time.

Useful Links

Koha Staff Login

University Research Repository

WebMail

Aris

Book Study Room

Mara Oral History

Hansard

SOCIAL MEDIA

Instagram

Facebook

Twitter

YouTube

WhatsApp

Ask Librarian

Contact Us

Postal Address
P.O.Box 35092
Dar es Salaam

Call Us: +255 22 2410500/9 Ext. 2165 ; Direct line +255 22 2410241

Fax No:: +255 22 2410241

Email:: directorlibrary@udsm.ac.tz

2025 University of Dar es Salaam - University Of Dar Es Salaam Library
Term of use / Privacy Policy