Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
Repository logo
    Communities & Collections
    All of DSpace
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Kazoba, Boniface Ngalaba"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • No Thumbnail Available
    Item
    Determination of contract time for construction projects towards improving methods for estimating time
    (University of Dar es Salaam, 2010) Kazoba, Boniface Ngalaba
    Contract time for any construction projects right from inception to completion is assuming great importance in the construction industry. The main objective of this study was to develop an improved method of systematic time estimates for construction projects in Tanzania. Such a method can be used by organizations involved in project planning and execution in building construction industry. The study used survey method to collect data whereby questionnaires were used supplemented with interviews. Views and opinions from practitioners in the construction industry were used to draw conclusions. Taking into account low level of the country’s infrastructure, communication and economic levels, the researcher investigated a typical model to use in estimating duration for a construction project in Tanzania. The study revealed that there is a need to have a wide knowledge of local challenges including infrastructures and economic levels that affect contract time for construction projects. It was noted traditional estimation of contract time was mostly based on actual time for activities on site. The study discovered that contract time was affected by actual activity schedule. Thus, there should be a way of looking into other factors like time for logistic management, mobilization of resources, external factors and provisional time for unforeseeable events, which play a great role in most delays of construction projects

About Library

The University of Dar es Salaam Library is a vital source of scholarly information that facilitates users to get access to learning and research resources during their studies. It provides access to a wide range of resources in both print and digital formats and conducive reading environment for users, regardless of their physical conditions. All registered users are eligible to access library resources and can borrow print materials from general shelves for a specific period of time.

Useful Links

Koha Staff Login

University Research Repository

WebMail

Aris

Book Study Room

Mara Oral History

Hansard

SOCIAL MEDIA

Instagram

Facebook

Twitter

YouTube

WhatsApp

Ask Librarian

Contact Us

Postal Address
P.O.Box 35092
Dar es Salaam

Call Us: +255 22 2410500/9 Ext. 2165 ; Direct line +255 22 2410241

Fax No:: +255 22 2410241

Email:: directorlibrary@udsm.ac.tz

2025 University of Dar es Salaam - University Of Dar Es Salaam Library
Term of use / Privacy Policy