Repository logo
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
Repository logo
    Communities & Collections
    All of DSpace
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Basondole, Paul Francis"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • Loading...
    Thumbnail Image
    Item
    Developing models for predicting time and cost overruns in road construction projects: a case study of the Tanzania National Road Agency (TANROADS)
    (University of Dar es Salaam, 2008) Basondole, Paul Francis
    Many road construction projects in Tanzania suffer from time and cost overruns, and there are no models to forecast their magnitudes. This dissertation on Developing Models for Predicting Time and Cost Overruns in Road Construction Projects: A Case Study of the Tanzania National Roads Agency (TANROADS), identified, ranked and prioritized factors influencing them at construction phase and explored whether there is an association between them. Sixty six respondents, about 67% of the total questionnaires sent out, ranked pre-identified factors. Using data from 35 projects executed by TANROADS between 2002 and 2006, the forecasting models were developed. The study established that inadequate contractors capacity (icc); availability of road construction equipment (ae), funding delays (fd); inadequate funding (if); unrealistic client's time and cost budgets (ucb); fluctuations of materials, labour and plant costs (fc); and poor supervision (ps) respectively were the top ranked. Having rated the factors on a 5-point scale, the predicted project completion duration, D (in days) and predicted contract value, V (in shillings) are respectively given by D=-74.5+1.3d+19icc-23.2ae+27.7fd+9.6f+5.1ucb and V=-934.9+1.7v+640icc-526.8ucb+344.6ae-73.8fd-3 16.7fc+121ps. The adjusted coefficients of multiple determinations (R2) show that 96% and 93% of the variations in the time and cost overruns respectively could be explained by the top ranked factors. However, the findings were derived from projects carried out by TANROADS alone; they should not therefore be generalized to projects which fall in different environment. A research encompassing projects in other civil engineering and building categories, which were not included in this study, is recommended.

About Library

The University of Dar es Salaam Library is a vital source of scholarly information that facilitates users to get access to learning and research resources during their studies. It provides access to a wide range of resources in both print and digital formats and conducive reading environment for users, regardless of their physical conditions. All registered users are eligible to access library resources and can borrow print materials from general shelves for a specific period of time.

Useful Links

Koha Staff Login

University Research Repository

WebMail

Aris

Book Study Room

Mara Oral History

Hansard

SOCIAL MEDIA

Instagram

Facebook

Twitter

YouTube

WhatsApp

Ask Librarian

Contact Us

Postal Address
P.O.Box 35092
Dar es Salaam

Call Us: +255 22 2410500/9 Ext. 2165 ; Direct line +255 22 2410241

Fax No:: +255 22 2410241

Email:: directorlibrary@udsm.ac.tz

2025 University of Dar es Salaam - University Of Dar Es Salaam Library
Term of use / Privacy Policy