Repository logo
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
Repository logo
    Communities & Collections
    All of DSpace
  • English
  • Català
  • ÄŒeÅ¡tina
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • LatvieÅ¡u
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Log In
    New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Amasi, Selemani Omary"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • No Thumbnail Available
    Item
    Assessment of the application of project time management principles and practices in selected road construction projects in Tanzania: the case of two projects namely; upgrading of Ndundu-Somanga road project to bitumen standard (57km) and upgrading of Mtwara corridor to bitumen standard lot 2: Peramiho-Mbinga (78km)
    (University of Dar es Salaam, 2014) Amasi, Selemani Omary
    The intention of the study was assessment of how project time management principles and practices are applied in Road Construction Projects in Tanzania using case studies of two projects namely; Upgrading of Ndundu-Somanga road project to bitumen standard (57km) and Upgrading of Mtwara Corridor to bitumen standard Lot 2: Peramiho-Mbinga (78km). Both projects were undertaken by foreign contractors registered in Class 1 with the CRB. The study also intended to identify causes of poor time management and suggestions on the way forward. The study was based on a survey using questionnaires combined with desk study of projects documents through prepared checklist of the processes. Through questionnaire, 60 respondents were asked to give their opinions in the Likert scale ranging from 1=strongly disagree, 2=disagree, 3=neutral, 4=agree, 5=strongly agree on the application of the processes, causes of poor time management and the way forward. The study used SPSS to perform multiple linear regression and T-test of the collected data. The processes were better applied in project two (57%) which was finished almost on time compared to (41%) for project one leading to conclude that; the project can be finished on time if these practices are well applied. Lastly the causes of poor time management in project one were identified as inadequate management, delay of payments and miscalculations, since their p-values (correlation strength) from analysis were less than 0.05. Therefore, the study recommends more improvements to be done on these causes as measures to be taken to improve applications of project time management principles and practices in road construction projects to reduce delays.

About Library

The University of Dar es Salaam Library is a vital source of scholarly information that facilitates users to get access to learning and research resources during their studies. It provides access to a wide range of resources in both print and digital formats and conducive reading environment for users, regardless of their physical conditions. All registered users are eligible to access library resources and can borrow print materials from general shelves for a specific period of time.

Useful Links

Koha Staff Login

University Research Repository

WebMail

Aris

Book Study Room

Mara Oral History

Hansard

SOCIAL MEDIA

Instagram

Facebook

Twitter

YouTube

WhatsApp

Ask Librarian

Contact Us

Postal Address
P.O.Box 35092
Dar es Salaam

Call Us: +255 22 2410500/9 Ext. 2165 ; Direct line +255 22 2410241

Fax No:: +255 22 2410241

Email:: directorlibrary@udsm.ac.tz

2025 University of Dar es Salaam - University Of Dar Es Salaam Library
Term of use / Privacy Policy